Skip to content
  • 💸 Don't miss out on 20-40% off! 💸
  • 💸 Don't miss out on 20-40% off! 💸
Furitek shopFuritek shop
  • Electric Motors & Esc’s
    • 1/10 Scale
    • Electric Motors
    • 1/8 Scale
    • Micro
    • Electronic Speed Controls
    • Large Scale
    • Esc Controllers
    • Esc/motor Combos
  • Servos
    • Standard
    • Mini & Micro
    • Large Scale
    • Continuous Rotation
  • Electric Motor Parts
    • Fans & Heatsinks
    • Rotors
    • Sensor Cables
    • Hardware
    • Bearings
    • Endbells & Faceplates
    • Sensors
    • Brushes & Springs
    • Stators
  • Wire & Connectors
    • Connectors
    • Wire
    • Pig Tails
    • Heat Shrink Tubing
    • Solder
  • Extension Leads
    • Airplanes
    • No products in the cart.

      Return to shop

  • Cart

    No products in the cart.

    Return to shop

 

Spektrum RC 2.9g Long Lead Linear Servo

Home / Servos / Mini & Micro / Analog
Sale!
Spektrum RC 2.9g Long Lead Linear Servo
Spektrum RC 2.9g Long Lead Linear Servo - Image 2
Spektrum RC 2.9g Long Lead Linear Servo -Furitek shop spmsh2040tl 1

$21.49 Original price was: $21.49.$15.04Current price is: $15.04.

SKU: 1426993 Categories: Analog, Mini & Micro, Servos Tag: Spektrum RC
  • Risk-Free Shopping with Returns
  • Experience the difference quality makes.
  • 100% Quality Satisfaction
  • Streamlined service, designed for your convenience.
Browse
  • Electric Motor Parts
    • Bearings
      • Rock Crawlers
    • Brushes & Springs
      • Rock Crawlers
    • Endbells & Faceplates
      • Rock Crawlers
    • Fans & Heatsinks
      • Rock Crawlers
    • Hardware
      • Cars & Trucks
      • Rock Crawlers
    • Rotors
      • Rock Crawlers
    • Sensor Cables
      • Rock Crawlers
    • Sensors
      • Rock Crawlers
    • Stators
      • Rock Crawlers
  • Electric Motors & Esc's
    • 1/10 Scale
      • Electric Motors
      • Esc Controllers
      • Esc/motor Combos
    • 1/8 Scale
      • Electric Motors
      • Esc Controllers
      • Esc/motor Combos
    • Electric Motors
      • Airplanes
      • Boats
      • Brushed
      • Brushless
      • Fpv Racing
      • Helicopters
    • Electronic Speed Controls
      • Airplanes
      • Boats
      • Helicopters
    • Esc Controllers
      • Brushed
      • Brushless
      • Fpv Racing
    • Esc/motor Combos
      • 540 Combos
    • Large Scale
      • Electric Motors
      • Esc Controllers
      • Esc/motor Combos
    • Micro
      • Electric Motors
      • Esc Controllers
      • Esc/motor Combos
  • Extension Leads
    • Airplanes
      • Electronics
  • Servos
    • Continuous Rotation
      • Cars & Trucks
    • Large Scale
      • Analog
      • Digital
      • High Voltage
    • Mini & Micro
      • Analog
      • Digital
      • Helicopter Tail
      • High Voltage
    • Standard
      • Analog
      • Brushless
      • Digital
      • Helicopter Tail
      • High Voltage
  • Uncategorized
  • Wire & Connectors
    • Connectors
      • Bullet
      • Plug
    • Heat Shrink Tubing
      • Airplanes
    • Pig Tails
      • Airplanes
    • Solder
      • Airplanes
    • Wire
      • Airplanes
      • Cars & Trucks
  • Description
  • Reviews (0)

Spektrum RC 2.9g Long Lead Linear Servo. This is a replacement servo intended for the E-flite UMX Timber X. Package includes one 2.9g long lead linear servo.

This product was added to our catalog on August 22, 2022

Reviews

There are no reviews yet.

Be the first to review “Spektrum RC 2.9g Long Lead Linear Servo” Cancel reply

Related products

Sale!
Spektrum RC Avian 4260 Brushless Outrunner Motor (800Kv)
Quick View

Electric Motors & Esc's

Spektrum RC Avian 4260 Brushless Outrunner Motor (800Kv)

$109.99 Original price was: $109.99.$76.99Current price is: $76.99.
Sale!
Spektrum RC Firma 8S 160 Amp Brushless Smart ESC
Quick View

Electric Motors & Esc's

Spektrum RC Firma 8S 160 Amp Brushless Smart ESC

$229.99 Original price was: $229.99.$98.99Current price is: $98.99.
Sale!
Spektrum RC Firma 150 Amp Sensorless Brushless Smart ESC & Motor Combo (2050Kv)
Quick View

Electric Motors & Esc's

Spektrum RC Firma 150 Amp Sensorless Brushless Smart ESC & Motor Combo (2050Kv)

$219.99 Original price was: $219.99.$98.99Current price is: $98.99.
Sale!
Spektrum RC Firma Crawler Sensored Brushless Smart ESC & Motor Combo (2800kV)
Quick View

1/10 Scale

Spektrum RC Firma Crawler Sensored Brushless Smart ESC & Motor Combo (2800kV)

$229.99 Original price was: $229.99.$95.99Current price is: $95.99.
Sale!
Spektrum RC Avian 120 Amp Brushless Smart ESC
Quick View

Electric Motors & Esc's

Spektrum RC Avian 120 Amp Brushless Smart ESC

$219.99 Original price was: $219.99.$99.99Current price is: $99.99.
Sale!
Spektrum RC Avian 3530 Brushless Outrunner Motor (1250Kv)
Quick View

Electric Motors & Esc's

Spektrum RC Avian 3530 Brushless Outrunner Motor (1250Kv)

$65.99 Original price was: $65.99.$46.19Current price is: $46.19.
Sale!
Spektrum RC Avian 30 Amp Brushless Smart ESC
Quick View

Electric Motors & Esc's

Spektrum RC Avian 30 Amp Brushless Smart ESC

$49.99 Original price was: $49.99.$34.99Current price is: $34.99.
Sale!
Spektrum RC Avian 130A 6S Brushless Smart ESC (Version A)
Quick View

Airplanes

Spektrum RC Avian 130A 6S Brushless Smart ESC (Version A)

$119.99 Original price was: $119.99.$83.99Current price is: $83.99.
MY ACCOUNT
  • My account
  • Wishlist
  • Checkout
  • Cart
ABOUT US
  • About Us
  • Returns & Exchanges
  • Delivery
  • FAQ
  • Contact Us
LEGAL
  • Privacy Policy
  • Shipping Policy
  • Payment Method
  • Term and Conditions
Signup for Newsletter

Subscribe to get special offers, free giveaways, and once-in-a-lifetime deals.

    Copyright 2026 © www.sensorcablesshop.com
    • Electric Motors & Esc’s
      • 1/10 Scale
      • Electric Motors
      • 1/8 Scale
      • Micro
      • Electronic Speed Controls
      • Large Scale
      • Esc Controllers
      • Esc/motor Combos
    • Servos
      • Standard
      • Mini & Micro
      • Large Scale
      • Continuous Rotation
    • Electric Motor Parts
      • Fans & Heatsinks
      • Rotors
      • Sensor Cables
      • Hardware
      • Bearings
      • Endbells & Faceplates
      • Sensors
      • Brushes & Springs
      • Stators
    • Wire & Connectors
      • Connectors
      • Wire
      • Pig Tails
      • Heat Shrink Tubing
      • Solder
    • Extension Leads
      • Airplanes
    • Login

    Login

    Lost your password?

    Register

    Your personal data will be used to support your experience throughout this website, to manage access to your account, and for other purposes described in our privacy policy.